Blazing (Painting) the Main Trails
Mid Summer - 2013
In mid summer, the red trail was reblazed.
October - 2013
In October, the Blue Trail north of the Serengeti was reblazed. The blue paint used is a bit lighter and better matches the the blue south of the Serengeti.