Trumbull Trails Coalition
September 4th, 2011 | About the Washed Out Fall Line >

-- North Bridge Connector Armoring --

June 9th - Trail Maintenance

Last Fall I built a New Trail an alternative connector between the Rail Trail and North Bridge. (see below)
It became a popular way in and out from the North Bridge but the curved armoring was avoided. A mud hole resulted.

I took advantage of the crappy weather on Sat (it was drizzling until late afternoon) to fix this up.

Rich Coffey- FCNEMBA Regional Trails Rep - Pequonnock River Valley State Park

ROLLOVER PHOTO FOR DETAILS

Re-Armoring

Armor Shift'


-- New Trail - Alternative Connector to North Bridge --

Sept. 4th, 2011

Sept 2011 - New Trail built as an alternative connector between the Rail Trail and North Bridge.

  • a flowy gradual curved climb
  • a fast bomb down and an easy ascent up.
  • built to sustainable standards

The current trail is a eroded and rutted fall line.

New Trail
 
North Bridge Connector
Looking Up
 
North Bridge Connector
Thru The Woods